Before implementing Glodon solutions, Globe Engineering Sdn. Bhd. relied on manual identification of MEP items and calculations for sprinkler piping, which was time-consuming and susceptible to human error. Explore how Glodon transformed their workflow and accelerated their quantity take-off process with the revolutionary Cubicost TME C.
The Challenges
The project presented a unique set of challenges with its two parts of drawing on each floor, to be combined into a single MEP system. This added a significant level of complexity to the task of determining the quantity for this project. Additionally, the project had a tight timeline to meet, which added further pressure to the team. However, with the implementation of Glodon solutions, these challenges were effectively addressed, enabling Globe Engineering Sdn Bhd. to streamline their workflow and accelerate their quantity take-off process.
Key Feature Highlight
Cubicost Implementation Journey
Before implementing Glodon solutions, Globe Engineering Sdn. Bhd. is accustomed to their manual quantity take-off processes, which not only consumed a significant amount of time and manpower but also hindered their ability to pursue multiple tenders simultaneously. This outdated approach to quantity take-off not only limited their productivity but also left them vulnerable to errors and inconsistencies in their calculations. As a result, they found themselves at a disadvantage in the competitive construction industry.
However, with the implementation of Glodon solutions, everything changed for the better. The innovative Cubicost TME C software provided Globe Engineering Sdn. Bhd. with a streamlined and efficient workflow, eliminating the need for labor-intensive manual calculations. This allowed the company to significantly increase their productivity and take on multiple tenders simultaneously, giving them a competitive edge in the market.
About Globe Engineering Sdn. Bhd.