Ciputra Development Tbk., a distinguished business conglomerate with a remarkable track record, embarked on an ambitious project, CitraLake Villa. This luxurious property development, consisting of 4 floors and covering an impressive floor area of 9,940 sqm, was set to become a symbol of excellence and innovation in the industry.
The Challenges
The CitraLake Villa project encountered its fair share of challenges. With numerous Bill of Quantity (BoQ) items, maintaining accuracy in calculations proved daunting and error-prone. Additionally, the show unit requirements underwent constant changes and recalculation, posing significant obstacles for the team. Embracing modern technology, particularly adopting digital solutions, was met with resistance from the QS team, making the shift to digitalisation a demanding task.
To overcome these challenges, Ciputra turned to the Cubicost TAS solution. This decision marked a turning point in their journey towards enhanced efficiency and precision.
Key Feature Highlight
|
|
|
Cubicost TAS solution proved indispensable, providing a range of powerful features that significantly eased the quantity take-off process. The BQ Module's cross-checking capability allowed for detailed 3D views, ensuring precise BOQs and leaving minimal room for errors caused by missing items or miscalculations.
The Benefits
Cubicost Implementation Journey
During the BIM implementation journey, Glodon's customer success consultants played a pivotal role in Ciputra’s success story. The consultants provided invaluable technical support for TAS-Revit (also known as TIO) operation, along with technical expertise, advice, and solutions that accelerated the company's BIM implementation. The dedicated service, flexibility for online and offline support, and intensive technical assistance were instrumental in swiftly building the required capacity for BIM-based quantity take-off. Glodon’s customer success consultants also played crucial roles in developing Ciputra’s key QS team member, enabling Ciputra to conduct their independent internal training and speed up capacity building of the staff.
With a visionary spirit driving the organisation, PT Ciputra Development, backed by Cubicost TAS solution and Glodon's customer success team, has made significant strides in the CitraLake Villa project. As they continue to embrace the potential of 5D BIM take-off in preconstruction, they exemplify a commitment to excellence, innovation, and success.